dc.contributor.author |
Amin, Asiful |
|
dc.date.accessioned |
2017-06-07T06:00:46Z |
|
dc.date.available |
2017-06-07T06:00:46Z |
|
dc.date.issued |
7/15/2009 |
|
dc.identifier.uri |
http://dspace.ewubd.edu/handle/2525/2155 |
|
dc.description |
This thesis submitted in partial fulfillment of the requirements for the degree of B.Sc in Electrical and Electronic Engineering of East West University, Dhaka, Bangladesh. |
en_US |
dc.description.abstract |
Today power sector is facing lots of problems to meet the needs of consumer. Lots of
organizations are installing their own power system. Transmission of power is a major part of
power system .Bus-bar, conduit and cable installations are important for the transmission of
power. This internship provided the opportunity of planning and monitoring the installation of the
power system. The internship provided the opportunity to learn about the BBT installation. BBT
installation is very new in our country and it requires knowledge about electrical installation. The
internship gives the opportunity to work as an executive. Working in practical field was
challenging. The purpose of the intern ship is fully served by gaining experience in this particular
field of engineering . |
en_US |
dc.language.iso |
en_US |
en_US |
dc.publisher |
East West University |
en_US |
dc.relation.ispartofseries |
;EEE00015 |
|
dc.subject |
BBT and Cable Installations |
en_US |
dc.title |
BBT and Cable Installations |
en_US |
dc.type |
Thesis |
en_US |